Previous Projects

Bocol & MACA JV

Perth Hay Street Bridge fabrication

Bocol & MACA JV

Perth Hay Street Bridge fabrication

Bocol & MACA JV

Perth Hay Street Bridge fabrication

Bocol & MACA JV

Perth Hay Street Bridge fabrication

Bocol & MACA JV

Perth Hay Street Bridge fabrication

Mayfield Switchroom venture

Mayfield Switchroom venture

Mayfield Switchroom venture

Mayfield Switchroom venture

Mayfield Switchroom venture

118361182_345571683265739_48528487337913

Mayfield Switchroom venture

Final loadout of truss package

Final loadout of truss package

2off 36m Truss

Truss Fabrication

Platform and steel fab

For Maritime Constructions

Truss Fabrication

Truss Fabrication

23rd April 2020

2x 24metre trusses being transported

23rd April 2020

2x 24metre trusses load out onto cockburn road.

23rd April 2020

2x 24metre trusses being escorted

21st April 2020 Load out

2off 18metre trusses completed and loading out

21st April 2020 Load out

2off 18metre trusses completed and loading out

21st April 2020 Load out

2off 18metre trusses completed and loading out

32 Metre Truss Fabrication

load out of Completed 32 Metre Truss

32 Metre Truss Fabrication

Completed 32 Metre Truss

32 Metre Truss Fabrication

Completed 32 Metre Truss

32 Metre Truss Fabrication

Completed 32 Metre Truss

6th April Load out 24 Metres

First part of trusses completed for Goodline FMG Project

6th April Load out 24 Metre Truss

First part of trusses completed for Goodline FMG Project

4OFF Piling Frames

4OFF Piling Frames

Fabrication in progress in yard

4OFF Piling Frames

4OFF Piling Frames

BHP Chutes - Goodline

Load out and completed

BHP Chutes - Goodline

Load out and completed

BHP Chutes - Goodline

Load out and completed

BHP Chutes - Goodline

Load out and completed

BHP Chutes - Goodline

Load out and completed

Chutes BHP - Goodline

Chutes BHP - Goodline

Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline656207871_871814567079759

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline

Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Austal Ships

Austal Ships

Austal Ships

Goodline

Royhill works

Goodline

Royhill works

Mayfield Industries

Switchroom fabrication load out

Bigbore Pipe Project

Pipe Project

Pipe Packages

Current Progress 31.7.19

Pipe Packages

Current Progress 31.7.19

Pipe Packages

Current Progress 31.7.19

Navigation Aids

Navigation Aids

Structural Marine & Mayfield Venture

Load out

Structural Marine & Mayfield Venture

Load out

Structural Marine & Mayfield Venture

Load out

Structural Marine & Mayfield Venture

Structural Marine & Mayfield Venture

All works being completed in workshop 3

Structural Marine & Mayfield Venture

Interior Fitout

Switchroom & Sub frame fabrication

Rio Tinto / Mayfield Industries

Switchroom & Sub frame fabrication

Rio Tinto / Mayfield Industries

Switchroom & Sub frame fabrication

Rio Tinto / Mayfield Industries

Navigation Aids

12off Navigation Aids Fabrication

Berth3

Port Hedland berth 3 load out

Berth3

Port Hedland berth 3 load out

Berth3

Port Hedland berth 3

Berth3

Port Hedland berth 3

Berth3

Port Hedland berth 3 load out

Berth3

Port Hedland berth 3

Berth3

Port Hedland berth 3

Fabrication of Steel Boat  -SME

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Berth3

Berth3

Port Hedland berth 3 reconstruction bracing

Berth3

Port Hedland berth 3 reconstruction bracing

Berth3

Port Hedland berth 3 reconstruction bracing

Berth3

Port Hedland berth 3 reconstruction bracing

Berth3 Bracing

Port Hedland berth 3 reconstruction bracing

Austal Ships

DNVGL Certified 2000KG Vessel Anchor

Austal Ships

DNVGL Certified 2000KG Vessel Anchor

CSI

Hoppers and Chute Fabrication

CSI

Hoppers and Chute Fabrication

CSI -

Hoppers and Chute Fabrication

637_SM-14

Barge Completion

Structural Marine built Barge credits: Empress Marine

Austal Ships

Austal Frames Load out

Austal Ships

Austal Frames Load out

Austal Ships

Austal Frames Load out

Austal Ships

Austal Frames Load out

Austals Frames

Austal Frames Load out

Austal Ships

Austal Frames Fabrication works

BHP Chimney

BHP Chimney

Austal Ships

Frame 1 of 5

Austal Ships

Frame 1 of 5

Austal Ships

Frame 1 of 5

Austal Ships

Frame 1 of 5

Austal Ships

Frame 1 of 5

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Burswood Pontoons 3OFF

Loading out 2 Pontoons to Burswood 24.3.18

Burswood Pontoons 3OFF

3 Painted Pontoons in Structural Marine workshop,

Burswood Pontoons 3OFF

Total AMS

Fabrication of platforms

Welded Pipes

Fabrication of pipes

Burswood Jetty

3 of 3 pontoons Loading out for surface treatment

Burswood Jetty

2 of 3 pontoons Loading out for surface treatment

Burswood Jetty

1 of 3 pontoons Loading out for surface treatment

Burswood Jetty

1 of 3 pontoons Loading out for surface treatment

Burswood Jetty

1 of 3 pontoons Loading out for surface treatment

2 off barges

Refurbishment of 2OFF Martime Constructions

2 off barges

Refurbishment of 2OFF Martime Constructions

2 off barges

Refurbishment of 2OFF Martime Constructions

Marine & Civil

Client : Marine & Civil One off nine 40m Catwalk Trusses

Burswood Jetty

Martime Constructions

Pontoon Turning

Martime Constructions

Pontoon Turning

McConnell Dowell

Platform Frames, EWP mats

McConnell Dowell

Platform Frames, Ewp Mats

McConnell Dowell

Platform frames, Stairs

McConnell Dowell

Platform frames, Stairs

Austals Lifting Frames

Load testing our fabricated lifting frames, 12.5 Tonne

Austals Lifting Frames

Passivisation Complete,

Martime Constructions

Burswood Jetty Fabrications Begin

Austal Ships

24OFF Lifting frames 316 Stainless Steel Fabrication

Austal Ships

24OFF Lifting frames 316 Stainless Steel Fabrication

McConnell Dowell

McConnell Dowell 900Welded Beams Fabrication

McConnell Dowell

McConnell Dowell 900Welded Beams Fabrication

McConnell Dowell

Platforms And Stairs Load Out

McConnell Dowell

Platforms And Stairs Load Out

McConnell Dowell

Platforms And Stairs Load Out

McConnell Dowell Platforms

McConnell Dowell Platforms Stairs

McConnell Dowell Platforms

McConnell Dowell Platforms Stairs

McConnell Dowell Platforms

McConnell Dowell Platforms

McConnell Dowell Platforms

McConnell Dowell Platforms

McConnell Dowell Platform 3x

McConnell Dowell Platform 3x

Cattle Ramp

In Full operation

Austal Ships Sub Frames

Baru Offshore Anchors

Baru Offshore 2OFF DNVGL certified Anchors

Baru Offshore Anchors

Baru Offshore 2OFF DNVGL certified Anchors

stevpris anchors

First of 9 - 12 tonne Stevpris anchors being built for Vryhof Anchors of the Netherlands for use on the Woodside Enfield oilfield to moor the FPSO vessel.

Austals Rudders

Austal Rudders DNVGL Certified Rudders

Narrows Bridge

Structural Marine Fabrications of Narrows Bridge perth railway

Access Platform

Lend Lease

Access Platform

Lend Lease

Fremantle Mandurah Railway

First of 9 sections (background) of the Fremantle to Mandurah railway bridge being built for Leighton Construction - construction weight 620 tonnes

Fremantle Mandurah Railway

First of 9 sections (background) of the Fremantle to Mandurah railway bridge being built for Leighton Construction - construction weight 620 tonnes

Matrix Platform

Matrix Platform

Cattle Ramp

Dampier Hoppers

3OFF 180Tonne Dampier Hoppers

Dampier Hoppers

3OFF 180Tonne Dampier Hoppers

Dampier Hoppers

3OFF 180Tonne Dampier Hoppers

Cattle Ramp

Pilbarra Ports Cattle Ramp

Testing Ramp

Cattle Ramp

Pilarra Ports Cattle Ramp Fabrication i

Pilbarra Ports Cattle Ramp

Testing Ramp

Pilbarra Ports Cattle Ramp

Testing Ramp

Tower Mills for Nippon Eirich

Client : Nippon/Eirich 5 Off Tower Mills

trommel barrel component

dumphopper

cable reel

mineralsands

transportable grizzly

vibrating screen

trommel grizzly

floating concentrator

trommel grizzly

trommel grizzly

rotary drier

surgebinpontoon_lg

aboutus_dredgebucketwheel_lg

southstreetbridge

Como Engineering

Ball mill repairs for Como Engineers.

Como Engineering

Ball mill repairs for Como Engineers.

aaaa

21_exmouthbridge

Client : AMB

Client : AMB Screening Hopper for Woody Woody

companyhighlights_capepasleyatug_lg

IMG_0226

Narrows Bridge Railway

Perth Passenger Railway Fabrication Narrows Bridge #narrowsbridge railway fabrication

Worsley

Large (6 metre diameter) exhaust stacks for Downer Engineering for use at Worsley Upgrade.

ILUKA

Trommel barrel for Iluka Mineral Sands.

ILUKA

Trommel barrel for Iluka Mineral Sands.

SME workshop

capabilities_trawler_lge

PRAWN TRAWLER

Marine And Civil

Client : Marine & Civil 40 metre Conveyer Truss for useless loop port upgrade

20170519_144741

20170519_144812

AUSTAL PINJARRA (3)

AUSTAL PINJARRA (1)

AUSTAL PINJARRA (2)

14_defensevessel_1

Client : Boskalis

Client : Boskalis 1 of 2 - 200 metre Dredge Pipe sections

Dampier Storage Tanks

Barite storage tanks – Design and Manufacture – part of an order of 3 tanks for installation at Port Hedland & 5 tanks for Dampier.

stevpris anchors

First of 9 - 12 tonne Stevpris anchors being built for Vryhof Anchors of the Netherlands for use on the Woodside Enfield oilfield to moor the FPSO vessel.

Exmouth Bridge

ALCAN GOVE 2 OFF 60 TONNE BOLLARD PULL TUGS

capabilities_alcantug_lg

alconcove

companyhighlights_cablereel

Narrows Bridge

Structural Marine Fabrications of Narrows Bridge perth railway