Previous Projects

Mayfield completed switchroom
Mayfield completed switchroom
switch room

Base completed

Switchroom base fabrication
Switch room - Northstar

Base completed for Mayfield

Austal Ships

Defence Force Rudder package for 6 Ships

Shed fabrications
TAMS

Piling Frame Fabricated and completed by SME

TAMS

Piling Frame Fabricated and completed by SME

TAMS

Piling Frame Fabricated and completed by SME

TAMS
186515310_2900487813603610_4096842867625
187189206_517968732567625_13204089194001

Piling Frame Fabricated and completed by SME

184799999_1144497646023487_6545016302948
TAMS

Piling Frame Fabricated and completed by SME

TAMS

Piling Frame Fabricated and completed by SME

TAMS

Piling Frame Fabricated and completed by SME

TAMS

Piling Frame Fabricated and completed by SME

TAMS

Piling Frame Fabricated and completed by SME

TAMS

Piling Frame Fabricated and completed by SME

TAMS

Piling Frame Fabricated and completed by SME

RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

Pile fabrications

RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

12OFF nav aids

195052653_156950886480505_20841069532053
RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

12OFF nav aids

RIO TINTO Maritime Constructions

Pile fabrications

Mayfield

Switch room complete and load out

BHP - Goodline chute package

Chute package complete and load out

BHP - Goodline chute package
BHP - Goodline chute package
BHP - Goodline chute package
BHP CHUTES

BHP CHUTES Goodline

Bocol & MACA JV

Perth Hay Street Bridge fabrication

Bocol & MACA JV

Perth Hay Street Bridge fabrication

I_MAC_BurswoodJetty_Completed_1
Bocol & MACA JV

Perth Hay Street Bridge fabrication

Bocol & MACA JV

Perth Hay Street Bridge fabrication

Bocol & MACA JV

Perth Hay Street Bridge fabrication

Mayfield Switchroom venture
Mayfield Switchroom venture
Mayfield Switchroom venture
Mayfield Switchroom venture
Mayfield Switchroom venture
118361182_345571683265739_48528487337913
Mayfield Switchroom venture
Final loadout of truss package

Goodline FMG Project

Final loadout of truss package

Goodline FMG Project

2off 36m Truss

Goodline FMG Project

Truss Fabrication

Goodline FMG Project

Platform and steel fab

For Maritime Constructions

Truss Fabrication

Goodline FMG Project

Truss Fabrication

Goodline FMG Project

23rd April 2020

2x 24metre trusses being transported Goodline FMG Project

23rd April 2020 Goodline FMG Project

2x 24metre trusses load out onto cockburn road.

23rd April 2020 Goodline FMG Project

2x 24metre trusses being escorted

21st April 2020 Load out

2off 18metre trusses completed and loading out Goodline FMG Project

21st April 2020 Load out

2off 18metre trusses completed and loading out Goodline FMG Project

21st April 2020 Load out

2off 18metre trusses completed and loading out Goodline FMG Project

32 Metre Truss Fabrication

load out of Completed 32 Metre Truss

32 Metre Truss Fabrication

Completed 32 Metre Truss Goodline FMG Project

32 Metre Truss Fabrication

Completed 32 Metre Truss Goodline FMG Project

32 Metre Truss Fabrication

Completed 32 Metre Truss Goodline FMG Project

6th April Load out 24 Metres

First part of trusses completed for Goodline FMG Project

6th April Load out 24 Metre Truss

First part of trusses completed for Goodline FMG Project

4OFF Piling Frames
4OFF Piling Frames

Fabrication in progress in yard

4OFF Piling Frames
4OFF Piling Frames
BHP Chutes - Goodline

Load out and completed

BHP Chutes - Goodline

Load out and completed

BHP Chutes - Goodline

Load out and completed

BHP Chutes - Goodline

Load out and completed

BHP Chutes - Goodline

Load out and completed

Chutes BHP - Goodline
Chutes BHP - Goodline
Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline656207871_871814567079759

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Goodline
Goodline

Fabrication of chutes

Goodline

Fabrication of chutes

Austal Ships
Austal Ships
Austal Ships
Goodline

Royhill works

Goodline

Royhill works

Mayfield Industries

Switchroom fabrication load out

Bigbore Pipe Project
Pipe Project
Pipe Packages

Current Progress 31.7.19

Pipe Packages

Current Progress 31.7.19

Pipe Packages

Current Progress 31.7.19

Navigation Aids
Navigation Aids
Structural Marine & Mayfield Venture

Load out

Structural Marine & Mayfield Venture

Load out

Structural Marine & Mayfield Venture

Load out

Structural Marine & Mayfield Venture
Structural Marine & Mayfield Venture

All works being completed in workshop 3

Structural Marine & Mayfield Venture

Interior Fitout

Switchroom & Sub frame fabrication

Rio Tinto / Mayfield Industries

Switchroom & Sub frame fabrication

Rio Tinto / Mayfield Industries

Switchroom & Sub frame fabrication

Rio Tinto / Mayfield Industries

Navigation Aids

12off Navigation Aids Fabrication

Berth3

Port Hedland berth 3 load out

Berth3

Port Hedland berth 3 load out

Berth3

Port Hedland berth 3

Berth3

Port Hedland berth 3

Berth3

Port Hedland berth 3 load out

Berth3

Port Hedland berth 3

Berth3

Port Hedland berth 3

Fabrication of Steel Boat  -SME
Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Fabrication of Steel Boat  -SME

Flash Back: Fabrication from beginning to end

Berth3
Berth3

Port Hedland berth 3 reconstruction bracing

Berth3

Port Hedland berth 3 reconstruction bracing

Berth3

Port Hedland berth 3 reconstruction bracing

Berth3

Port Hedland berth 3 reconstruction bracing

Berth3 Bracing

Port Hedland berth 3 reconstruction bracing

Austal Ships

DNVGL Certified 2000KG Vessel Anchor

Austal Ships

DNVGL Certified 2000KG Vessel Anchor

CSI

Hoppers and Chute Fabrication

CSI

Hoppers and Chute Fabrication

CSI -

Hoppers and Chute Fabrication

637_SM-14
Barge Completion

Structural Marine built Barge credits: Empress Marine

Austal Ships

Austal Frames Load out

Austal Ships

Austal Frames Load out

Austal Ships

Austal Frames Load out

Austal Ships

Austal Frames Load out

Austals Frames

Austal Frames Load out

Austal Ships

Austal Frames Fabrication works

BHP Chimney

BHP Chimney

Austal Ships

Frame 1 of 5

Austal Ships

Frame 1 of 5

Austal Ships

Frame 1 of 5

Austal Ships

Frame 1 of 5

Austal Ships

Frame 1 of 5

Burswood Pontoon Jetty

Manufactured by Structural Marine

Burswood Pontoon Jetty

Manufactured by Structural Marine

Delivery of Burswood Jetty

Manufactured by Structural Marine

Delivery of Burswood Jetty

Manufactured by Structural Marine

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Pontoon Launch

Burswood Optus Stadium Pontoon launch and tow

Burswood Pontoons 3OFF

Loading out 2 Pontoons to Burswood 24.3.18

Burswood Pontoons 3OFF

3 Painted Pontoons in Structural Marine workshop,

Burswood Pontoons 3OFF
Total AMS

Fabrication of platforms

Welded Pipes

Fabrication of pipes

Burswood Jetty

3 of 3 pontoons Loading out for surface treatment

Burswood Jetty

2 of 3 pontoons Loading out for surface treatment

Burswood Jetty

1 of 3 pontoons Loading out for surface treatment

Burswood Jetty

1 of 3 pontoons Loading out for surface treatment

Burswood Jetty

1 of 3 pontoons Loading out for surface treatment

2 off barges

Refurbishment of 2OFF Martime Constructions

2 off barges

Refurbishment of 2OFF Martime Constructions

2 off barges

Refurbishment of 2OFF Martime Constructions

Marine & Civil

Client : Marine & Civil One off nine 40m Catwalk Trusses

Burswood Jetty
Martime Constructions

Pontoon Turning

Martime Constructions

Pontoon Turning

McConnell Dowell

Platform Frames, EWP mats

McConnell Dowell

Platform Frames, Ewp Mats

McConnell Dowell

Platform frames, Stairs

McConnell Dowell

Platform frames, Stairs

Austals Lifting Frames

Load testing our fabricated lifting frames, 12.5 Tonne

Austals Lifting Frames

Passivisation Complete,

Martime Constructions

Burswood Jetty Fabrications Begin

Austal Ships

24OFF Lifting frames 316 Stainless Steel Fabrication

Austal Ships

24OFF Lifting frames 316 Stainless Steel Fabrication

McConnell Dowell

McConnell Dowell 900Welded Beams Fabrication

McConnell Dowell

McConnell Dowell 900Welded Beams Fabrication

McConnell Dowell

Platforms And Stairs Load Out

McConnell Dowell

Platforms And Stairs Load Out

McConnell Dowell

Platforms And Stairs Load Out

McConnell Dowell Platforms

McConnell Dowell Platforms Stairs

McConnell Dowell Platforms

McConnell Dowell Platforms Stairs

McConnell Dowell Platforms

McConnell Dowell Platforms

McConnell Dowell Platforms

McConnell Dowell Platforms

McConnell Dowell Platform 3x
McConnell Dowell Platform 3x
Cattle Ramp

In Full operation

Austal Ships Sub Frames
Baru Offshore Anchors

Baru Offshore 2OFF DNVGL certified Anchors

Baru Offshore Anchors

Baru Offshore 2OFF DNVGL certified Anchors

stevpris anchors

First of 9 - 12 tonne Stevpris anchors being built for Vryhof Anchors of the Netherlands for use on the Woodside Enfield oilfield to moor the FPSO vessel.

Austals Rudders

Austal Rudders DNVGL Certified Rudders

Narrows Bridge

Structural Marine Fabrications of Narrows Bridge perth railway

Access Platform

Lend Lease

Access Platform

Lend Lease

Fremantle Mandurah Railway

First of 9 sections (background) of the Fremantle to Mandurah railway bridge being built for Leighton Construction - construction weight 620 tonnes

Fremantle Mandurah Railway

First of 9 sections (background) of the Fremantle to Mandurah railway bridge being built for Leighton Construction - construction weight 620 tonnes

Matrix Platform
Matrix Platform
Cattle Ramp
Dampier Hoppers

3OFF 180Tonne Dampier Hoppers

Dampier Hoppers

3OFF 180Tonne Dampier Hoppers

Dampier Hoppers

3OFF 180Tonne Dampier Hoppers

Cattle Ramp
Pilbarra Ports Cattle Ramp

Testing Ramp

Cattle Ramp

Pilarra Ports Cattle Ramp Fabrication i

Pilbarra Ports Cattle Ramp

Testing Ramp

Pilbarra Ports Cattle Ramp

Testing Ramp

Tower Mills for Nippon Eirich

Client : Nippon/Eirich 5 Off Tower Mills

trommel barrel component
dumphopper
cable reel
mineralsands
transportable grizzly
vibrating screen
trommel grizzly
floating concentrator
trommel grizzly
trommel grizzly
rotary drier
surgebinpontoon_lg
aboutus_dredgebucketwheel_lg
southstreetbridge
Como Engineering

Ball mill repairs for Como Engineers.

Como Engineering

Ball mill repairs for Como Engineers.

aaaa
21_exmouthbridge
Client : AMB

Client : AMB Screening Hopper for Woody Woody

companyhighlights_capepasleyatug_lg
IMG_0226
Narrows Bridge Railway

Perth Passenger Railway Fabrication Narrows Bridge #narrowsbridge railway fabrication

Worsley

Large (6 metre diameter) exhaust stacks for Downer Engineering for use at Worsley Upgrade.

ILUKA

Trommel barrel for Iluka Mineral Sands.

ILUKA

Trommel barrel for Iluka Mineral Sands.

SME workshop
capabilities_trawler_lge
PRAWN TRAWLER
Marine And Civil

Client : Marine & Civil 40 metre Conveyer Truss for useless loop port upgrade

20170519_144741
20170519_144812
AUSTAL PINJARRA (3)
AUSTAL PINJARRA (1)
AUSTAL PINJARRA (2)
14_defensevessel_1
Client : Boskalis

Client : Boskalis 1 of 2 - 200 metre Dredge Pipe sections

Dampier Storage Tanks

Barite storage tanks – Design and Manufacture – part of an order of 3 tanks for installation at Port Hedland & 5 tanks for Dampier.

stevpris anchors

First of 9 - 12 tonne Stevpris anchors being built for Vryhof Anchors of the Netherlands for use on the Woodside Enfield oilfield to moor the FPSO vessel.

Exmouth Bridge
ALCAN GOVE 2 OFF 60 TONNE BOLLARD PULL TUGS
capabilities_alcantug_lg
alconcove
companyhighlights_cablereel